KOLUSZKI TUNNEL
Tunnel under the railway tracks between Gałków Duży and Gałków Mały









The project of a level crossing between the towns of Gałków Duży and Gałków Mały in the Design and Build formula. The study included a complete multi-industry project along with a set of administrative decisions, i.e. the environmental decision and the ZRID decision.
Location: Gałków Mały and Gałków Duży in the Koluszki commune
Ordering party (Client): Koluszki Commune and PKP Polskie Linie Kolejowe
General Contractor: Strabag Sp. z o. o.
Main Designer: Lentas Sp. z o. o.
Implementation period: 2020 - 2022
Total length of the road tunnel: 180m
Span length (tunnel width): 14.32 m
Date of commissioning: 2023